Underground and surface water management networks designed for reliability, compliance and urban flood mitigation.
Zakir Enterprise constructs drainage, sewer and water infrastructure systems for urban, industrial and institutional clients — covering underground pipe networks, open channel systems, manholes, pumping stations and water supply lines.
Our underground works teams manage the full installation sequence — trench excavation, bedding preparation, pipe laying, joint inspection, manhole construction, testing and backfill — with safety-controlled trench management and WASA or DPHE compliance at every step.Surface drainage systems, stormwater channels and flood mitigation networks are integrated alongside underground infrastructure to provide complete catchment-level water management solutions for both new developments and rehabilitation projects.
Water infrastructure delivery covers the full sequence — survey to trench to test to reinstatement — with safe excavation controls and WASA/DPHE compliance maintained throughout.
Pipe route survey, trench excavation to design depth with safe shoring and dewatering as required.
Concrete, PVC, HDPE and ductile iron pipe laying with joint inspection and bedding to specification.
Precast or in-situ manhole, inspection chamber, inlet and junction box construction at design locations.
Open channel, box drain and roadside drain construction for surface runoff collection and conveyance.
Hydrostatic pressure testing, leakage testing and CCTV camera inspection of installed pipelines.
Controlled backfill in layers, compaction testing and surface reinstatement of roads or pavements disturbed.
Underground drainage delivery follows a strict sequence — survey, excavate, install, test, reinstate — with trench safety controls and WASA compliance maintained at every step.
Pipe route confirmation, invert levels, slope checks and material specification review.
Trench excavation, shoring, dewatering and pipe bedding preparation.
Pipe installation, jointing, manhole construction and utility crossings.
Pressure test, CCTV inspection, leak check and system performance verification.
Layer backfill with compaction testing and full surface reinstatement.
Drainage clients choose us for our pipe laying experience, safe excavation management and record of delivering to WASA, DPHE and government drainage specifications.
Experienced pipe laying and manhole teams with safe trench management on urban and rural sites.
Works delivered to national water and sewerage authority specifications with full test records.
Concrete, RCP, PVC, HDPE, DI and GRP pipe installation — material matched to service and loading.
Drainage systems sized for catchment hydrology and flood-level compliance requirements.
Trench shoring, edge protection and permit-to-enter systems for confined space safety.
All pipelines tested and inspected before trench reinstatement so defects are caught early.
From high-production trenching units and dewatering pumps to pipe tongs, compaction rammers and CCTV inspection cameras — our drainage fleet is matched to urban and rural underground works.

Our drainage teams manage the full installation sequence — trench to pipe to test to reinstatement — with safe excavation procedures, compliance documentation and CCTV inspection before backfill.
Clear answers to what municipalities, developers and government clients ask most often before engaging Zakir Enterprise for underground drainage and water works.
Speak with our project team for a detailed discussion on scope, timeline and pricing.
Contact Project Team
Share your site details, scope and timeline. Our project team will respond with a structured quotation and delivery roadmap within two working days.