Home/Projects/Patuakhali Naval Warehouse
GovernmentCompletion - 2025Patuakhali, Bangladesh

Patuakhali Naval Warehouse

A purpose-built government warehouse delivering secure, large-span storage for the Bangladesh Navy's southern coastal operations

Client
Bangladesh Government Navy
Project Type
Government Projects
Location
Patuakhali, Bangladesh
Duration
5 months
Completion
2025
Project Overview

Built tough, handed over fast a naval warehouse the southern coast can depend on.

Patuakhali is not the easiest place to run a construction project. The coastal conditions, remote location, and tight government timeline made delivery complex. Within 4 to 5 months, the team took this site from bare ground to a fully handed-over naval warehouse, ready for immediate operations. Every structural decision was made with end use in mind - heavy naval equipment, long-term coastal durability, and strict government security standards.

“No delays. No incidents. Just a building the Bangladesh Navy could actually rely on.”

SCOPE OF WORKS / 04

Services delivered on this project.

Eight coordinated work packages delivered in sequence from site enabling works through to final handover, all under a single Zakir Enterprise contract.

01

RCC Superstructure

Concrete frame built to heavy load-bearing specs, designed to store and support serious naval equipment and supplies long-term.

02

Pre-Engineered Steel Roof

Wide-span steel truss system with blue corrugated cladding and polycarbonate skylights for maximum internal height and natural light.

03

EOT Overhead Crane System

Overhead travelling crane infrastructure installed across the full floor span for safe movement of heavy naval cargo.

04

Fire Suppression System

Full ceiling-mounted red-pipe fire safety network spanning the entire warehouse floor, commissioned before handover.

05

MEP Works

Industrial lighting, electrical systems, ventilation ducting and plumbing installed for round-the-clock warehouse operations.

06

Security Fenestration

Double-band windows with heavy iron grilles across the full perimeter, meeting government security requirements.

07

Site Preparation

Coastal site clearing, levelling and drainage groundworks completed before any structural work commenced.

08

Heavy-Duty Warehouse Floor

Thick industrial concrete slab laid and finished to withstand forklifts, trolleys and heavy equipment without degradation.

KEY HIGHLIGHTS / 06

Outcomes that matter.

Outcomes and metrics for this project are available on request.

2025
Year

Delivery Window

Primary delivery timeline aligned to 2025.

4
Months

Execution Duration

Project duration: 4-5 months.

100
%

Completion Status

Current project status: Completed.

GOV
Type

Client Segment

Government project delivered for Patuakhali, Bangladesh.

CASE STUDY / 07

Case Study

Project delivery story: challenge, approach, result.

01 - The Challenge

Constructing a government-grade naval warehouse in a coastal zone under a strict 4-5 month deadline with no margin for delay.

02 - The Approach

Concurrent roofing and civil works to compress the schedule, weekly on-site reviews, and strict structural tolerances throughout.

03 - The Result

A fully operational, crane-equipped, fire-safe naval warehouse handed over on time to the Bangladesh Navy's southern coastal command.

Start a Conversation

Need a warehouse built to government standard?

Patuakhali Naval Warehouse · Zakir Enterprise