Delivery Window
Primary delivery timeline aligned to 2024.

A three-storied central mosque built for 24 ECB Brigade at Comilla University accommodating 10,000 worshippers across two dedicated prayer floors, with ground floor parking and a total built area of 9,380 sq.m
This religious / institutional construction government project in Comilla University, Kotbari, Comilla was delivered with a focus on quality, safety and schedule discipline. From mobilization to handover, the team coordinated structural works, services and finishing to match project requirements and long-term performance goals.
“A three-storied central mosque built for 24 ECB Brigade at Comilla University accommodating 10,000 worshippers across two dedicated prayer floors, with ground floor parking and a total built area of 9,380 sq.m”
Eight coordinated work packages delivered in sequence from site enabling works through to final handover, all under a single Zakir Enterprise contract.
RCC Substructure — Foundations, piers and abutments built to government spec across all three bridge sites simultaneously.
Steel Arch Fabrication & Erection — Structural steel arch superstructure for the 49m main bridge, fabricated and erected by specialist steel teams.
38m All-Traffic Bridge — Full construction of the second all-traffic bridge with integrated footpath, running parallel to the main arch structure.
42m Pedestrian Bridge — Dedicated pedestrian-only crossing over Rampura Khal, independently designed and constructed for safe foot traffic.
Deck & Footpath Works — Bridge deck construction across all traffic bridges including integrated footpaths up to 15.40m deck width on the main span.
Steel Fabrication & Connection Works — On-site steel assembly, bolting and welding of all arch members, deck supports and connection joints across all three structures.
Site Safety Management — Strict zero-compromise safety programme managing 100–120 workers across three concurrent bridge construction sites in urban Dhaka..
Site Preparation & Temporary Works — Site setup, khal access management, temporary falsework and shoring installed before permanent works began on all three bridges.
Selected site photography capturing the foundation, superstructure, and facade phases of the project documented by our site engineering team.







Outcomes and metrics for this project are available on request.
Primary delivery timeline aligned to 2024.
Project duration: Ongoing.
Current project status: Completed.
Religious / Institutional Construction project delivered for Comilla University, Kotbari, Comilla.
Project delivery story: challenge, approach, result.