49m All Traffic Steel Arch Bridge

A major government infrastructure project in Rampura, Dhaka delivering three bridges under one contract: two double-lane all-traffic steel bridges with footpath connecting Banasree with Aftab Nagar, and a dedicated pedestrian bridge over Rampura Khal.

Client
Government Client
Project Type
Bridge Works
Location
Rampura, Dhaka
Duration
22 months
Completion
2025
Project Overview

Built for Rampura, Dhaka, delivered with disciplined execution.

The first is a 49m all-traffic steel arch bridge with a 15.40m deck accommodating double lanes plus footpath. Running alongside it is a 38m all-traffic bridge also carrying a footpath for pedestrians. And separately, a 42m pedestrian-only bridge crosses Rampura Khal - giving foot traffic a safe, dedicated route away from vehicles entirely. All three sit on RCC substructures, all three started December 6, 2025, and all three are being delivered by the same team of 100 to 120 workers under a single government contract worth 50 Crore BDT.

“A major government infrastructure project in Rampura, Dhaka delivering three bridges under one contract: two double-lane all-traffic steel bridges with footpath connecting Banasree with Aftab Nagar, and a dedicated pedestrian bridge over Rampura Khal.”

SCOPE OF WORKS / 04

Services delivered on this project.

Eight coordinated work packages delivered in sequence from site enabling works through to final handover, all under a single Zakir Enterprise contract.

01

RCC Superstructure

RCC Substructure — Foundations, piers and abutments built to government spec across all three bridge sites simultaneously.

02

Pre-Engineered Steel Roof

Steel Arch Fabrication & Erection — Structural steel arch superstructure for the 49m main bridge, fabricated and erected by specialist steel teams.

03

Equipment Integration

38m All-Traffic Bridge — Full construction of the second all-traffic bridge with integrated footpath, running parallel to the main arch structure.

04

Fire Safety System

42m Pedestrian Bridge — Dedicated pedestrian-only crossing over Rampura Khal, independently designed and constructed for safe foot traffic.

05

MEP Works

Deck & Footpath Works — Bridge deck construction across all traffic bridges including integrated footpaths up to 15.40m deck width on the main span.

06

Security and Enclosure

Steel Fabrication & Connection Works — On-site steel assembly, bolting and welding of all arch members, deck supports and connection joints across all three structures.

07

Site Preparation

Site Safety Management — Strict zero-compromise safety programme managing 100–120 workers across three concurrent bridge construction sites in urban Dhaka..

08

Industrial Floor System

Site Preparation & Temporary Works — Site setup, khal access management, temporary falsework and shoring installed before permanent works began on all three bridges.

KEY HIGHLIGHTS / 06

Outcomes that matter.

Outcomes and metrics for this project are available on request.

2025
Year

Delivery Window

Primary delivery timeline aligned to 2025.

22
Months

Execution Duration

Project duration: 22 months.

100
%

Completion Status

Current project status: Completed.

GOV
Type

Client Segment

Government project delivered for Rampura, Dhaka.

CASE STUDY / 07

Case Study

Project delivery story: challenge, approach, result.

01 - The Challenge

Delivering a bridge work in Rampura, Dhaka under a fixed timeline and strict quality requirements.

02 - The Approach

Phased planning, disciplined site supervision, and coordinated engineering execution across all work packages.

03 - The Result

A completed project delivered for Rampura, Dhaka, aligned with the client scope and timeline.